Our Process
Venting work for Geigers Landing gas fireplaces
How high a B-vent must rise
Florida's fuel gas code (section 503.6.6) requires a Type B gas vent to terminate not less than 5 feet in vertical height above the highest connected draft hood or flue collar, and section 503.6.7 requires it to end with a listed cap or listed roof assembly. DuraVent adds that pipe from 3 to 12 inches in diameter must end at least 2 feet higher than an adjacent wall or obstruction within 8 feet.
Height and the cap both affect how the vent draws. Our team checks the B-vent above your Geigers Landing roof against the roof pitch table in the vent instructions, the nearby walls and the code, and prices any extension or cap replacement it needs.
If you smell gas near the fireplace
A gas smell is an emergency before it is anything else. Leave the house and call your gas utility or 911 from outside. Appliance safety instructions add that no appliance should be lit, no electrical switch touched and no phone used inside the building.
Once the utility or responders have made the home safe, our team can inspect the venting and the fireplace connection in Geigers Landing and explain what we find. Vent work is planned only after that.
Protecting exterior vent parts
Exterior vent parts weather like anything else on a roof or wall. The Type B instructions note that outside portions of the vent may be painted with high temperature paint to help prevent rusting, and a listed top locked to the pipe protects the vent against rain, debris and birds.
The finish on exposed vent parts and the cap's hold on the pipe get checked on your Geigers Landing home. Rusted parts are replaced, and sound parts can be cleaned and painted with a suitable high temperature paint.
What your vent estimate covers
The written estimate for vent work on your Geigers Landing fireplace names the vent system and model, the sections, elbows, caps or terminations to be replaced or installed, supports and firestops, any wall or enclosure access and finishing, and the checks made after the work.
Each item is priced upfront with no hidden fees, and the free inspection comes first. Book within 72 hours of that inspection and 10% comes off the work, whether it is a single cap or a full new route.





